Alteration work
Contents |
[edit] Introduction
A building may need to be altered at some point after it has been constructed during its in-use period. This will necessitate alteration work.
Alteration work may be required for a wide range of reasons, including:
- Factors unforeseeable at the design stage, e.g new efficiency standards become possible.
- Total or partial change of use e.g an office block converted into housing.
- Change of ownership necessitating enlargement, extension or other changes.
- Failure of building components.
- Changing technological possibilities.
- Fashion
- Wear and tear.
Common examples of alterations include:
- Extension.
- Partial demolition.
- Linking or separating spaces.
- Making or closing openings.
- Retrofitting a new component or feature.
- Refurbishing an existing component or feature.
- Renovating an existing component or feature.
- Repairing an existing component or feature.
- Maintenance.
- Decoration.
Alteration work may be instigated by:
- The building owner.
- The building tenant (with the owner’s permission).
- The local authority (e.g if it needs to take urgent action or has instigated a compulsory purchase order).
- Central government (e.g. changes in regulations).
Alteration work can be complex and may involve higher design and construction fees than new build work. Appointing a designer or contractor to carry out the works may be on the basis of a firm that has successfully undertaken work in the past and is trusted by the client/building owner; or by inviting firms to tender for the work in an invitation to tender (ITT).
[edit] Permissions
Some alteration works may require planning permission while some may be considered ‘permitted development’ for which planning permission will not be required. The best way to determine whether a development is ‘permitted’ or not is to refer to the local planning authority.
Examples of permitted development include:
- Certain enlargements or alterations to houses.
- Construction of some sheds and fuel storage containers.
- Certain porches, doors and windows.
For more information see: Permitted development.
Alteration work may also require building regulations approval.
For more information see: Do the building regulations apply to works to existing buildings?
[edit] Variations
The term ‘alteration work’ as used in this article should not be confused with alterations to the scope of works of a construction contract, which are more commonly known as ‘variations’. Variations are changes involving addition, substitution, or omission to the original scope of the construction contract, and can affect the design, quantities, quality, working conditions or sequencing of the works.
For more information see: Variations.
[edit] Related articles on Designing Buildings Wiki
- Building regulations.
- CDM.
- Change of use class.
- Do the building regulations apply to existing buildings?
- Henry Boot Construction Ltd v Alstom Combined Cycles.
- International Existing Building Code (IEBC).
- Material change of use.
- Planning permission.
- Permitted development.
- Refurbishment.
- Renovation.
- Retrofit.
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February